- Details
- Hits: 2482
Timetable: Wabash Railroad - Main Line 1st District - Toledo to Montpelier
The 1st District of the Wabash Railroad extended from Toledo to Montpelier. Siding length as of 1941.
Station | MP from Toledo | Notes |
Toledo | 0.0 | Yard |
Toledo Yard | 1.3 | Yard |
Walbridge Junction xNKP | 3.3 | I |
Gould xTT | 5.3 | |
Wanick Junction xWAB | 8.6 | |
Maumee | 9.2 | |
Monclova | 12.6 | |
Midway | 17.2 | |
Brailey | 22.2 | |
Delta | 26.3 | |
Delta Yard | 29.4 | Yard P112 |
Wauseon xNYC xDTI | 33.7 | I I P66 |
Eckley | 39.4 | |
Elmira | 42.5 | P54 |
West Unity xBig4 | 49.1 | I P52 |
Montpelier | 58.3 | J |
Key: BB=Bascule Bridge | C=Coal | CS=Car Shop | D=Open > Day | DN=Open Day and night | DS=Dispatcher | DT=Double Main Track | EH=Engine house | F=Diesel Fuel | HI=Half Interlocked Crossing | I=Interlocked Crossing | J=Junction | LB=Lift bridge | N=Open at night | P=Passing Track w/40' car capacity | Q=Quarry | RH=Roundhouse # stalls | RT=Railroad Resort | S=Scales | SB=Swing bridge | T=Turntable | TC=Telegraph call | W=Water | X=Crossing | Y=Wye | Yard=Yard
Notes
Time Line
1929: The Wabash installs automatic block signals on this line for 1.6 miles at Delta, Ohio. This includes three signals. [RSC-1930]
1941. This line was CTC and block signals from Walbridge Junction to Wanick Junction.
Bibliography
The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]:
- [AAB| = All Aboard!, by Willis Dunbar, Eerdmans Publishing, Grand Rapids ©1969.
- [AAN] = Alpena Argus newspaper.
- [AARQJ] = American Association of Railroads Quiz Jr. pamphlet. © 1956
- [AATHA] = Ann Arbor Railroad Technical and Historical Association newsletter "The Double A"
- [AB] = Information provided at Michigan History Conference from Andrew Bailey, Port Huron, MI