Timetable: Soo Line - Main Line - Gladstone to Rhinelander

The Soo Line extended west from Gladstone to Rhinelander, WI. This line was completed in 1902 and continues today, except between Larch (near North Escanaba) and Hermansville, which was abandoned in 1999.

Station MP from St. Paul Notes
Pembine, WI 289.6  
WI/MI State Line 301.7  
Johnson's Spur 302.0  
Faithorn Junction x-W&M 302.8

X

Faithorn 303.0  
Malacca 306.3  
Meyer 308.2  
Spur 308 308.0  
Spur 309 309.0  
Hermansville xC&NW 310.7 X
Spur 315 314.5  
Farnham 318.0  
Hansons Spur 318.0  
Radford's Spur 321.0  
Larsons Spur 323  
Parsons Spur 324  
Eustis 325.1  
Tesch xCNW xCNX 327.8 X/I
Haggersons Spur 329.0  
Newhall J-SOO 330.5 J
McQueens Spur 333.0  
(Junction) J-Soo 335.0 J
North Escanaba 337.9  
(Bridge) 338.9 Over E&LS, Interurban
Larch xC&NW 339.4  
(Junction) J-Soo Ore Dock Line 342.3 J-Soo Ore Dock Spur - 0.8 miles long
Gladstone 342.7 Yard C CS DN EH RH F S T W 
(Junction) J-Soo Coal Dock Line 343.4 J-Soo Coal Dock Spur - 1.5 miles long
     

Note Key: BB=Bascule Bridge | C=Coal | CS=Car Shop | D=Open > Day | DN=Open Day and night | DS=Dispatcher | DT=Double Main Track | EH=Enginehouse | F=Diesel Fuel | HI=Half Interlocked Crossing | I=Interlocked Crossing | J=Junction | LB=Liftbridge | N=Open at night | P=Passing Track w/40' car capacity | Q=Quarry | RH=Roundhouse # stalls | RT=Railroad Resort | S=Scales | SB=Swingbridge | T=Turntable | TC=Telegraph call | W=Water | X=Crossing | Y=Wye | Yard=Yard

[REF] = [MRL] plus additions.


Time Line

1888. This Soo Line main track through the Upper Peninsula was built and opened in 1888. Originally known as the Minneapolis, St. Paul & Sault Ste. Marie railroad, it became the Soo Line railroad in 1961. The railroad also builds the international bridge over the Sault straits to Canada in 1888. It is called the Sault Ste. Marie Bridge Company and owned jointly by the Canadian Pacific, DSS&A and the MStP&SSM. [MRL]

1902. The MStP&SSM, in conjunction with the DSS&A, established the Sault Ste. Marie Depot Company and a Union Depot and track 1/2 mile long.

1943. SNAPSHOT. The railroad ran one round-trip passenger train bertween Gladstone and Rhinelander daily. trains #7 and #8 made the 126 mile trip in about 8 hours, with Michigan stops at Hermansville and Faithorn. Two way freight trains operated each way, one daily and one M-W-F. [ETT-1943]

1987. The Soo Line was purchased by the Wisconsin Central. It later became the Union Pacific (temporarily) and then Canadian National.

1999. The portion of the line from Larch (near North Escanaba) and Hermansville was abandoned with trackage rights used on the C&NW instead. At some point, the E&LS also gained trackage rights on this route, rather than using their original line to Channing to access their former Milwaukee Road trackage to Green Bay.

Bibliography

The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]:

  • [AAB| = All Aboard!, by Willis Dunbar, Eerdmans Publishing, Grand Rapids ©1969.
  • [AAN] = Alpena Argus newspaper.
  • [AARQJ] = American Association of Railroads Quiz Jr. pamphlet. © 1956
  • [AATHA] = Ann Arbor Railroad Technical and Historical Association newsletter "The Double A"
  • [AB] = Information provided at Michigan History Conference from Andrew Bailey, Port Huron, MI

Contact Us

Invalid Input

Invalid Input

Invalid Input

Invalid Input

Invalid Input

Invalid Input

 
Email: webmaster@michiganrailroads.com

Social