- Details
- Hits: 2340
Timetable: Pere Marquette - Beaverton Branch - Coleman to Beaverton
This was a short branch line from the main line at Coleman to Beaverton. Station hours in 1942.
Station | MP from Toledo | Notes |
Coleman | 0.0 | D |
Lyle | ||
Beaverton | 11.1 | D |
Key: BB=Bascule Bridge | C=Coal | CS=Car Shop | D=Open > Day | DN=Open Day and night | DS=Dispatcher | DT=Double Main Track | EH=Engine house | F=Diesel Fuel | HI=Half Interlocked Crossing | I=Interlocked Crossing | J=Junction | LB=Lift bridge | N=Open at night | P=Passing Track w/40' car capacity | Q=Quarry | RH=Roundhouse # stalls | RT=Railroad Resort | S=Scales | SB=Swing bridge | T=Turntable | TC=Telegraph call | W=Water | X=Crossing | Y=Wye | Yard=Yard
Notes
Time Line
1932. Michigan railroads since 1932 have quit using the following tracks. Some continue to exist but are not in use: PM from Coleman to Beaverton. [DFP-1949-1009]
Bibliography
The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]:
- [AAB| = All Aboard!, by Willis Dunbar, Eerdmans Publishing, Grand Rapids ©1969.
- [AAN] = Alpena Argus newspaper.
- [AARQJ] = American Association of Railroads Quiz Jr. pamphlet. © 1956
- [AATHA] = Ann Arbor Railroad Technical and Historical Association newsletter "The Double A"
- [AB] = Information provided at Michigan History Conference from Andrew Bailey, Port Huron, MI