- Details
- Hits: 847
Timetable: MC Blue Lake Branch
Time Line
1917. The Michigan Railroad Commission granted permission to remove the south end of the Blue Lake Branch, beginning at a point in the SW 1/4 of SW 1/4, Section 3, T28N-R5W, running south 19.243 feet together with three sidings projecting therefrom consisting of 2,587 feet of track. [MCR-1917]
Bibliography
The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]:
- [AAB| = All Aboard!, by Willis Dunbar, Eerdmans Publishing, Grand Rapids ©1969.
- [AAN] = Alpena Argus newspaper.
- [AARQJ] = American Association of Railroads Quiz Jr. pamphlet. © 1956
- [AATHA] = Ann Arbor Railroad Technical and Historical Association newsletter "The Double A"
- [AB] = Information provided at Michigan History Conference from Andrew Bailey, Port Huron, MI