Location: Plum Creek, Monroe, MI

Plumb Creek is a location at milepost 16.8 of the CN Shoreline subdivision. This is a junction with the joint CN/NS line to the Detroit Edison coal fired plant on Lake Erie. There is also a connection with the NS here. Plum Creek crosses under the railroad here.


Notes


Time Line

Location: Plum Creek, Monroe, MI

Plumb Creek is a location at milepost 16.8 of the CN Shoreline subdivision. This is a junction with the joint CN/NS line to the Detroit Edison coal fired plant on Lake Erie. There is also a connection with the NS here. Plum Creek crosses under the railroad here.


Notes


Time Line

Bibliography

The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]:

  • [AAB| = All Aboard!, by Willis Dunbar, Eerdmans Publishing, Grand Rapids ©1969.
  • [AAN] = Alpena Argus newspaper.
  • [AARQJ] = American Association of Railroads Quiz Jr. pamphlet. © 1956
  • [AATHA] = Ann Arbor Railroad Technical and Historical Association newsletter "The Double A"
  • [AB] = Information provided at Michigan History Conference from Andrew Bailey, Port Huron, MI

Contact Us

Invalid Input

Invalid Input

Invalid Input

Invalid Input

Invalid Input

Invalid Input

 
Email: webmaster@michiganrailroads.com

Social