Built → Detroit, Flint & Saginaw Railway → Saginaw & Flint railway
Built: 1904 Saginaw to Bridgeport.
Operated for 4 years.
Became: 1908 sold to S&F.
Reference: [MRRC]
This was an electric line.
1906. November. A bank is appointed receiver of the DF&S. [RG-1906-1130]
The following sources are utilized in this website. [SOURCE-YEAR-MMDD-PG]: