- Details
- Hits: 1466
Mine: Wheeling Mine, Negaunee, MI
Began → Wheeling Mine → Davis Mine → Milwaukee-Davis Mine
Operated for 3 years.
From: 1884
Location: SW-NW Sec. 7 of T47N-R26W
Owned by:
Produced: Iron Ore
Method: Underground
Railroad connection:
Until: 1887
Lifetime Production: 10,552 tones from 1884-1887 (included in Milwaukee-Davis mine)
Source: [LSIO-1950]
Notes
Opened in 1884; shipped in 1884-1885 and 1887 when it became the Davis mine; later a part of Milwaukee-Davis Mine.
Time Line