- Details
- Hits: 2134
Mine: Moro Mine, Ishpeming, MI
Cleveland Mine (part) → Moro Mine → Became
Operated for 28 years.
From: 1890
Location: S 1/2-NE Sec. 10 of T47N-R27W
Owned by: Cleveland-Cliffs Iron Company.
Produced: Iron Ore, hard, non-bessemer specular. Crushed.
Method: Underground, by room and pillar method. Greatest depth was 814 feet.
Railroad connection: LS&I to Predque Isle dock.
Until: 1918
Lifetime Production: 1,119,354 tones from 1890-1918.
Source: [LSIO-1950]
Notes
SE-NE Sec. 10 was once part of the Cleveland Mine.
SW-NE Sec. 10 now part of the Cliffs Shaft mine.
Time Line