RRHX

Timetable:  PM Baldwin to Traverse City

Michigan's Internet Railroad History Museum

 

 

 

 

 

 

Timetable Menu

RRHX Home

MichiganRailroads.com

----------

 

 

 Stations

 MP

 Open

 Siding

 Notes

 

from Grand Rapids

in 1949

45' car lengths in 1949

 

  Connection with the PM Comstock Park-Baldwin Line        

Baldwin

   Crossing of the PM Ludington Branch

73.8

DN

67

Stop signs, then Interlocked.  Wye. Coaling tower. Water tank with deep wells.

Wolf Lake

81.8

 

27

 

Peacock

   Crossing of the Michigan East & West

85.0

 

53

 

Little Manistee

 

 

 

 

Irons

91.7

 

49

 

Dublin

   Crossing of the Manistee & Luther

 

 

 

Florence

Wellston

97.7

 

41

 

High Bridge      

Over Mainstee River, 1,170 foot viaduct 80' above water.

Article about High Bridge

Brethern

105.2

 

 

 

Kaleva

   Crossing of the Manistee & Northeastern

110.1

D

54

In 1949 at gated crossing, set against M&NE trains.

BL&E Crossing

   Crossing of the Bear Lake & Eastern

 

 

 

 

Henry

   Crossing of the Arcadia & Betsey River RR

 

 

 

 

Thompsonville

   Crossing of the Ann Arbor Main Line

120.9

D

43

Interlocking.

Wallin

   Jct. with the PM West End Branch

 

 

 

 

Clarey

   Jct. with the PM Honor Branch

 

 

 

 

Bendon

130.5

 

 

 

Interlochen

   Crossing of the Manistee & Northeastern

134.2

 

29

 

Grawn

138.0

 

 

 

Beitner

 

 

 

Three mile ascending grade SB at 1.32%.

Boardman

   Jct. with the PM State Hospital Branch

147.2

D

Yard

Wye. 2-chute coaling station, 100 ton capacity.  7 stall roundhouse with 65' turntable.

Traverse City

   Jct. with the Manistee & Northeastern

147.7

 

 

 

Connection with the PM Traverse City to Petosky Branch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

         
Key: Single Track:   Double Track:  

Top of page.